Cepeda la Mora. Waste Water Treatment

Cepeda la Mora. Waste Water Treatment

Client: Junta de Castilla y León

Award date: November 2016

Tender base budget for the work: € 203,898.20

Junta de Castilla y León

Memoria Descriptiva de los Trabajos

Construction project of the corresponding works for the treatment of wastewater in the town of Cepeda la Mora.

The design population is of 500 equivalent inhabitants, processing a flow of 125 m3/day.

The main elements that make up the designed plant are the following:

• Pretreatment with two roughing channels, the normal operating channel equipped with a screw-type screen and the by-pass channel equipped with a manual screen.

• Compact purification unit of 3.5 meters in diameter and 21 meters in length, equipped with four submerged aerators of 2kW.

• Treated water outlet chamber, in which an electromagnetic flow meter is installed.

On the other hand, appropriate actions are provided, to eliminate the infiltrations in the existing sewerage network of the town in three different points of the town.