Outlet pipe construction and Wastewater Treatment Plant in Los Santos (Salamanca)
Technical Assistance verifying the correct execution of the work, according to the conditions defined in the project, as well as in the specifications. In addition, INDEPRO will carry out the Health and Safety Coordination.
Customer: Junta de Castilla y León
Allocation Date: 2018
Description of the Works
The objective of the contract is the Health and Safety Coordination, and the monitoring of the works for the outlet pipe and the wastewater treatment plant in Los Santos (Salamanca).
Characteristics of the constructed wastewater treatment plant
The treatment system to be built in each of the plants consists of the following elements:
External works of the wastewater treatment plant
- Power line installation
- Doubling of the collector (Ø400 mm) arriving at the wastewater treatment plant
- Construction of spillway
Outdoor facilities
- General earthwork • Dewatered sludge hopper
- Arrival work • Dehydrator and control building
- Compact Pretreatment • Pipeline network
- Delivery Manhole • Mechanical equipment
- SBR (ABJ) Chambers • Electrical equipment
- Treated water metering chamber • Urbanization and landscaping
- Pouring Control Manhole • Finishes and trims
- Thickener • Set up and operation