Recalculation of the Hydrological Study on the banks of the Pisuerga River (Valladolid)
Recalculation of the Hydrological and Hydraulic Study for the "Pisuerga river bank treatment project in Valladolid. Phase 4. Left bank between Arturo Eyries Bridge and La Flecha
Description of the Works:
This project is proposed as a technical report to support the Integration and Improvement of the Pisuerga River Banks Project. Phase 4.2: Management of Banks and Treatment of Slopes on the Left Bank, between the Blue Division Bridge and the Civil Protection Building. A simulation of the hydraulic behavior of the Pisuerga river in the municipality of Valladolid is carried out.
Customer: Condenavi, Castillo y Cía
Allocation Date: 2012
The purpose of this analysis is to determine the water depths for different floods in the section between the “División Azul bridge" and the “Civil Protection building" (“Pedro Gomez Bosque" footbridge), being the final objective of the study to determine the limits of the different pits to optimize the rehabilitation works on the left bank of the Pisuerga river in the aforementioned section.