Wastewater treatment plant in Borsa si Viseu de Sus. Romania
Project for the construction of a wastewater treatment plant in the town of Borsa (Romania)
Description of the Works:
INDEPRO Engineering Consultants, S.L. is carrying out the elaboration of a construction project that defines and quantifies the necessary works for the wastewater treatment of Borsa (Romania), the sizing will be carried out for a population of 8,100 equivalent inhabitants and an average flow of 2,794 m3/day.
Customer: Elecnor Infraestructuras
Allocation Date: 2013
Tender Base Construction Budget: 7.900.823,49 €
The treatment system consists of the following elements:
- Roughing by means of a grate
- Raw water pumping chamber – Sand trap
- Desander – Grease trap
- Primary settling
- Biological reactor
- Secondary longitudinal settling tank
- Sludge recirculation