Cugir Wastewater Treatment Plant, in Judetul Alba, Romania

Cugir Wastewater Treatment Plant, in Judetul Alba, Romania

Detailed design for the construction of wastewater treatment works in the town of Cugir (Romania)

Description of the Works:

Construction project of the wastewater treatment works in the town of Cugir (Romania).

The sizing will be carried out for a population of 30,000 equivalent inhabitants and an average flow of 5,994 m3/day.

Customer: Ideconsa

Allocation Date: 2012

Tender Base Construction Budget: 5.233.740,09 €

The wastewater treatment system consists of the following elements:

  • Arrival chamber prior to roughing by means of a grate.
  • Raw water pumping chamber – Desander
  • Desander – Grease separator
  • Biological reactor
  • Secondary longitudinal decanter
  • Sludge recirculation
  • Gravity thickener of dewatered sludge
  • Dehydrated sludge temporary storage tank