Sealing of the waste dump in La Alamedilla del Berrocal (Ávila)

Sealing of the waste dump in La Alamedilla del Berrocal (Ávila)

Execution and Construction Management for the sealing of the Construction and Demolition Waste Landfill in La Alamedilla del Berrocal (Ávila)

Description of the Works:

INDEPRO performs the functions of Construction Management, verifying the appropriate execution of the work, complying with the conditions defined in the project as well as in the specifications.

Customer: Ayuntamiento de Ávila

Allocation Date: Septiembre 2016

Tender Base Construction Budget: 787.096,01 €

The general procedure to carry out the works is made up of a series of phases, works or actions that are described below:

  • Movement of waste.
  • Evacuation of rainwater.
  • Leachate network.
  • Landscape recovery of the area.

Considering the type of existing waste (mainly inert but with the existence of some elements that may contain heavy metals or pollutants for surface water), the surface of the waste will be impermeabilized.