Wastewater treatment in Cepeda la Mora (Ávila)
Description of the Works:
Construction project of the appropriate sewage treatment systems in the municipality of Cepeda la Mora.
The design population is 500 equivalent inhabitants, treating a flow of 125 m3/day.
Moreover, appropriate actions are planned to eliminate leaks in the sewage network that exist in the pipelines at three different points in the municipality.
Customer: Junta de Castilla y León
Allocation Date: 2016
Tender Base Budget for the work: 203.898,20 €
The principal elements that make up the projected plant are as follows:
- Pretreatment with two roughing channels, the normal working channel is equipped with a screw type screen and the by-pass channel equipped with a manual grid.
- Compact purification unit with a diameter of 3.5 meters, and a length of 21 meters, equipped with four submerged aerators of 2kW power.
- Treated water outlet chamber, in which an electromagnetic flow meter is installed.