Wastewater treatment in Cepeda la Mora (Ávila)

Wastewater treatment in Cepeda la Mora (Ávila)

Description of the Works:

Construction project of the appropriate sewage treatment systems in the municipality of Cepeda la Mora.

The design population is 500 equivalent inhabitants, treating a flow of 125 m3/day.

Moreover, appropriate actions are planned to eliminate leaks in the sewage network that exist in the pipelines at three different points in the municipality.

Customer: Junta de Castilla y León

Allocation Date: 2016

Tender Base Budget for the work: 203.898,20 €

Junta de Castilla y León

The principal elements that make up the projected plant are as follows:

  • Pretreatment with two roughing channels, the normal working channel is equipped with a screw type screen and the by-pass channel equipped with a manual grid.
  • Compact purification unit with a diameter of 3.5 meters, and a length of 21 meters, equipped with four submerged aerators of 2kW power.
  • Treated water outlet chamber, in which an electromagnetic flow meter is installed.